Bug #5413
"Supreme <Insert Celstial Body> <X> Journey" Contract Reset
0%
Description
The Supreme Journey contract, in this case "Supreme Gilly 4 Journey" resets itself if the entire craft is not returned to Kerbin, or if any part is destroyed upon re-entry.
Steps to Replicate:
1) Embark on "Supreme Journey"-type contract
2) Land on all required celestial bodies with a craft which includes a lander module and a return module
3a) Separate the landing stage and land the return module on Kerbin OR
3b) Attempt to land both modules at once, but allow any single part to explode during re-entry
Expected: So long as the lander and re-entry modules are launched together as a single craft, you should be able to return with a separate landing stage and have it count. Otherwise, the Apollo program would have apparently not landed on the Moon according to this KSP contract criteria.
Result/Observed: Once the landing requirements are met, the entire craft as of that point must be returned to the surface of Kerbin without any single part exploding or moving too far from each other.
Fixes/Workarounds: Using the Alt+12 Cheat menu, land the entire craft by disabling maximum temperature and crash damage.
Notes: I had been using a few mods, but the bug still occurs when the mods are removed
History
#1 Updated by bv1 about 9 years ago
- File Challenge 1 CM Launcher.craft Challenge 1 CM Launcher.craft added
- File Challenge 1 Lander Launcher.craft Challenge 1 Lander Launcher.craft added
I should add that I built the vessel in Kerbin Orbit using two launches. Here are the craft files for the two launches.
#2 Updated by ToneStack about 9 years ago
- Status changed from New to Confirmed
- % Done changed from 0 to 10
Confirmed for Mac OS X with one additional concern;
Even using the workaround cheat menu options.
When I land on kerbin by splashing down into the water, then ship still has some parts that break apart/disconnect and the contract resets.
#3 Updated by bv1 about 9 years ago
Does anyone know whether Supreme Gilly 4 Journey is the only contract of this type, or are there multiple?
#4 Updated by TriggerAu over 8 years ago
- Status changed from Confirmed to Needs Clarification
- % Done changed from 10 to 0