Project

General

Profile

Bug #7149

Part test contract fulfilment under invalid circumstances

Added by AlastairCodd about 8 years ago. Updated almost 8 years ago.

Status:
Needs Clarification
Severity:
Very Low
Assignee:
-
Category:
-
Target version:
-
Start date:
03/03/2016
% Done:

0%

Version:
Platform:
Windows
Expansion:
Language:
English (US)
Mod Related:
No
Votes:
Arrow u r green
Arrow d r red

Description

Subject: Part test contract fulfilment under invalid circumstances
Description: When asked to test a part under specific circumstances, it is possible to circumvent the requirements when testing engines. Contract note says that the part must be activated through the staging menu to fulfil the contract, but the engine may be already be firing.

Steps to Replicate:
1) Get a contract to test an engine at a certain altitude
2) Create a craft capable of transporting the engine to the required altitude
3) Activate the engine by right clicking on it before the correct altitude has been reached
4) Wait until the craft is at the correct altitude, and the indicator in the contract view has turned green
5) Activate the engine through staging by pressing the spacebar. The contract will be completed.

Expected: Either the contract should be completed on reaching the desired altitude with the engine active, or the contract should not be completed if the engine is already active.

Result/Observed: Tested with a solid rocket engine, may not hold with liquid propellent engines.

History

#1 Updated by TriggerAu almost 8 years ago

  • Status changed from New to Needs Clarification

Also available in: Atom PDF